Dis file commot from Wikimedia Commons wey oda projects sa dey use am. Dem show de description for file description page top for down der.
Summary
DescriptionBui Dam Nov 2013.JPG
English: Bui Dam, Ghana in November 2013 shortly before official opening. Looking upstream, approximately north-east. Powerhouse at right, with three orange penstocks visible above the roof (one for each generator). Spillway has five bays. The penstock for the future house unit is visible at the left. The dam crest is about 75 metres above the powerhouse main floor. Powerhouse paved road under construction visible in foreground.
to share – to copy, distribute de transmit de work
to remix – to adapt de work
Under de following conditions:
attribution – You for give appropriate credit, provide link to de license, den indicate if dem make changes. You fi do so for any reasonable manner insyd, but no be any way wey dey suggest de licensor dey endorse you anaa your use.
share alike – If you remix, transform, or build upon de material, you fi distribute your contributions under de same anaa compatible license as de original.